Skip to content

Prepare a future release

Status: future work; release scope has not been agreed.

Goal

Verify the agreed release scope and document remaining limits before calling an update ready.

To do

  • [ ] Check short game flows, one/two-player paths and relevant stage appearances without agent testing of real stages.
  • [ ] Check intended build, code stripping, platform, input, save and online behavior separately.
  • [ ] Agree on remaining non-blocking issues and release scope with the owner.

The owner handles Windows/Steam and physical-device checks where those devices and services are required. A passing Editor test alone is not release readiness.