Prepare a future release¶
Status: future work; release scope has not been agreed.
Goal¶
Verify the agreed release scope and document remaining limits before calling an update ready.
To do¶
- [ ] Check short game flows, one/two-player paths and relevant stage appearances without agent testing of real stages.
- [ ] Check intended build, code stripping, platform, input, save and online behavior separately.
- [ ] Agree on remaining non-blocking issues and release scope with the owner.
The owner handles Windows/Steam and physical-device checks where those devices and services are required. A passing Editor test alone is not release readiness.